Temporary bridge installed over Golden Gate canal

A temporary bridge has been installed at 23rd Street Southwest over the Golden Gate main canal in order to provide a detour for traffic while the existing White Boulevard bridge is removed and replaced.

The temporary bridge is expected to be opened to traffic for the detour around midday on Monday, Jan. 7. A temporary traffic signal has been installed at Golden Gate Boulevard and 23rd Street Southwest to assist with the detoured traffic while the construction work progresses over the next six or seven months. Additional pavement markings, temporary speed humps and signage will be in place when the temporary bridge is opened to traffic to assist drivers traveling the area.

The speed limit in the vicinity of the work is 30 mph. Drivers are urged to stay alert and use caution.

For more information on the work that could affect your commute, visit www.colliergov.net/RoadAlert.

© 2013 marconews.com. All rights reserved. This material may not be published, broadcast, rewritten or redistributed.

  • Discuss
  • Print

Comments » 0

Be the first to post a comment!

Share your thoughts

Comments are the sole responsibility of the person posting them. You agree not to post comments that are off topic, defamatory, obscene, abusive, threatening or an invasion of privacy. Violators may be banned. Click here for our full user agreement.

Comments can be shared on Facebook and Yahoo!. Add both options by connecting your profiles.

Features